Shipping

We plan the sequence of installation in consultation with the contractor and fill our crates so that the right parts are staged to be on hand when you need them. Sub-assembled pieces are shrink-wrapped on to rigid cardboard for protection. Solid crates of 2 x 4’s faced with 7/16″ board are built for shipping the product. These can be sent on a semi-truck, train, ocean liner or by air.